Contact Seller

Siemens - Rolls Royce Combined Cycle 75 MW Gas Turbine Power Plant

Year: 2017
Condition: Used
Located in Estonia
Ref #: 150489

Product Description

Combined Cycle Gas Turbine Power Plant 75 MW/50 Hz – Zero Hours

This equipment was delivered in 2017 by an EPC contractor who selected Rolls-Royce and Siemens as main equipment suppliers. This was a greenfield project and therefore delivery contained all equipment needed for 75 MW power plant operation, like fuel gas treatment plant, water treatment plant and complete switchyard with step-up transformers

Technical Characteristics

Manufacturing year                2017

Gas turbine                             Rolls-Royce Trent 60, Dry Low Nox

Steam turbine                         Siemens SST-300

Step up tranfomers                 2 pc Alstrom 11kV to 154 kW

Complete switchyard             Siemens 154 kV

Nominal output 100%            60 MW + 15 MW

Max efficiency                       Single cycle 42 %, combi cycle 54%

Heat recovery steam boiler    30 bar / 300 C

Water treatment                     Sand and active coal filters + RO 

Documentation                      Complete original in English

Delivery                                 Complete plant equipment from water and gas treatment to power supply to the grid

Status                                      70% Installed, zero hours, many items like turbine still in original factory boxes

 

Thank you for visiting our website. Unfortunately, this machine is no longer available however, please find a selection of machines for sale below; which may be of interest to you.

Click Here For More Results

All Categories > Power Generation > Power Plant

Product Description

Combined Cycle Gas Turbine Power Plant 75 MW/50 Hz – Zero Hours

This equipment was delivered in 2017 by an EPC contractor who selected Rolls-Royce and Siemens as main equipment suppliers. This was a greenfield project and therefore delivery contained all equipment needed for 75 MW power plant operation, like fuel gas treatment plant, water treatment plant and complete switchyard with step-up transformers

Technical Characteristics

Manufacturing year                2017

Gas turbine                             Rolls-Royce Trent 60, Dry Low Nox

Steam turbine                         Siemens SST-300

Step up tranfomers                 2 pc Alstrom 11kV to 154 kW

Complete switchyard             Siemens 154 kV

Nominal output 100%            60 MW + 15 MW

Max efficiency                       Single cycle 42 %, combi cycle 54%

Heat recovery steam boiler    30 bar / 300 C

Water treatment                     Sand and active coal filters + RO 

Documentation                      Complete original in English

Delivery                                 Complete plant equipment from water and gas treatment to power supply to the grid

Status                                      70% Installed, zero hours, many items like turbine still in original factory boxes

 

Most Popular Searches

Important Note to Genuine Buyers!

To help in the fight against internet scammers...
If you are a genuine buyer, please add as much detail to your enquiry as possible. Full company name, full company email address (i.e. not Yahoo, Hotmail or Gmail), website and company telephone numbers will help ensure that your message is treated as a genuine enquiry!

Thank you for your understanding!

Other Info

Sell Your Machine

Why Advertising with IM is the Best Choice for You.

Latest Deals

Register to Receive Details on the Latest Machines Listed.


Join Our