Contact Seller

2006 - CO2 Purification Plant Union Engineering RBU 1500 kg

Year: 2006
Condition: Used
Located in Finland
Ref #: 135676

Product Description

CO2 Purification and Liquifying Plant Union Engineering RBU 1500 kg

 

Gaseous carbon dioxide (CO2) is fed from the fermentation process through the foam separator where fermentation foam is removed and gas is pumped to the intermediate 50 m3 CO2 buffer storage balloon (NOTE: Foam separator is not included in this equipment) From this intermediate storage gas is fed into the scrubber where  designed to clean the CO2 from ethanol and other impurities are washed away with a clean water flow in counter current scrubber.

 

Ethanol free CO2 gas is fed into intercooled piston type CO2 compressor where it is compressed in two stages into 18.5 bar. Compressed gas (CO2) is led in to purification unit where it passes through double acting, electric heated cleaning and drying filters. These filters are removing odor causing components and draining of CO2, which is then fed to the liquefaction plant. Liquefaction plant consist a condenser, stripping drum, evaporator and chiller running on R507 refrigerant. Refrigerant is compressed with a screw cooling compressor and it evaporates in the condenser and cools CO2 at - 30 0 C, allowing the condensation of CO2 at a pressure of 17.4 bar. Non-condensable gases will be extracted from liquid CO2 in this stage. Clean, liquefied carbon dioxide is pumped into the storage tank. 

 

Main technical data

Manufacturer  Union Engineering

Manufacturing year    2006

Capacity          1500 kg/h

Cooling refrigerant     Freon R507

Control PLC    Siemens Simatic S7 series 

Contact the Seller

For more information or to express interest in this machine,
please fill out this short enquiry form:

*First Name
*Company
*Country
*Telephone
Website
*Email
*Confirm Email
*Message

Product Description

CO2 Purification and Liquifying Plant Union Engineering RBU 1500 kg

 

Gaseous carbon dioxide (CO2) is fed from the fermentation process through the foam separator where fermentation foam is removed and gas is pumped to the intermediate 50 m3 CO2 buffer storage balloon (NOTE: Foam separator is not included in this equipment) From this intermediate storage gas is fed into the scrubber where  designed to clean the CO2 from ethanol and other impurities are washed away with a clean water flow in counter current scrubber.

 

Ethanol free CO2 gas is fed into intercooled piston type CO2 compressor where it is compressed in two stages into 18.5 bar. Compressed gas (CO2) is led in to purification unit where it passes through double acting, electric heated cleaning and drying filters. These filters are removing odor causing components and draining of CO2, which is then fed to the liquefaction plant. Liquefaction plant consist a condenser, stripping drum, evaporator and chiller running on R507 refrigerant. Refrigerant is compressed with a screw cooling compressor and it evaporates in the condenser and cools CO2 at - 30 0 C, allowing the condensation of CO2 at a pressure of 17.4 bar. Non-condensable gases will be extracted from liquid CO2 in this stage. Clean, liquefied carbon dioxide is pumped into the storage tank. 

 

Main technical data

Manufacturer  Union Engineering

Manufacturing year    2006

Capacity          1500 kg/h

Cooling refrigerant     Freon R507

Control PLC    Siemens Simatic S7 series 

Most Popular Searches

Important Note to Genuine Buyers!

To help in the fight against internet scammers...
If you are a genuine buyer, please add as much detail to your enquiry as possible. Full company name, full company email address (i.e. not Yahoo, Hotmail or Gmail), website and company telephone numbers will help ensure that your message is treated as a genuine enquiry!

Thank you for your understanding!

Other Info

Sell Your Machine

Why Advertising with IM is the Best Choice for You.

Latest Deals

Register to Receive Details on the Latest Machines Listed.


Join Our
Mailing List!